The following ASTM D2487/US Bureau of Reclamation Soil Groups classify different soils for embedment, i.e., soils which are used for placement in the trench surrounding the pipe, compacted or uncompacted, to provide support for the pipeline. These groups classify naturally occurring soils as well as manufactured materials. The groups are also for use in classifying undisturbed trench wall materials.
GROUP A -- Angular graded stone (6mm - 40mm), including a number of fill materials that have regional significance, such as crushed stone, crushed gravel, and crushed shell.
GROUP B (GW, GP, SW, SP ) -- Coarse-grained soils with little or no fines, no particles larger than 40mm, including a number of fill materials that have regional significance which have rounded grains, such as pea gravel.
GROUP C (GM, GC, SM, SC, CL, ML, ML-CL, CL-CH, ML-MH ) -- Coarse-grained soils with fines and fine-grained soils with medium to no plasticity, with greater than 25% coarse particles, liquid limit (LL) less than 50%.*
GROUP D (CL, ML, ML-CL, CL-CH, ML-MH ) -- Fine-grained soils with medium to no plasticity, with less than 25% coarse particles, liquid limit (LL) less than 50%.*
GROUP E (CL, MH, CH, MH) -- Fine-grained soils with medium to high plasticity, liquid limit (LL) greater than 50%.
GROUP F (PT) -- Organic soils.
*Designer must determine percentage of coarse particles to accurately determine soil group.
INT Maximum Recommended Depths of Cover (m) (Access Roads, Soil Type C, Bedding in 100mm Loose Material)
Maximum Recommended Depths of Cover (m)
(Access Roads, Soil Type C, Bedding in 100mm Loose Material) |
Nominal Size
(mm) |
Class |
Trench Type II |
Trench Type III |
| 100 |
K9 |
40 |
40 |
| 150 |
K9 |
18 |
19 |
| 200 |
K9 |
12 |
13 |
| 250 |
K9 |
9.9 |
10 |
| 300 |
K9 |
8.4 |
9.4 |
| 350 |
K9 |
7.4 |
8.6 |
| 400 |
K9 |
6.7 |
8 |
| 450 |
K8 |
4.9 |
6.4 |
| 450 |
K9 |
6.3 |
7.9 |
| 500 |
K8 |
4.6 |
6.3 |
| 500 |
K9 |
5.9 |
7.3 |
| 600 |
K7 |
3 |
4.9 |
| 600 |
K8 |
4.4 |
6.2 |
| 600 |
K9 |
5.4 |
7 |
| 700 |
K7 |
2.7 |
4.6 |
| 700 |
K8 |
3.9 |
5.7 |
| 700 |
K9 |
5.1 |
6.7 |
| 800 |
K7 |
2.5 |
4.4 |
| 800 |
K8 |
3.5 |
5.4 |
| 800 |
K9 |
4.9 |
6.6 |
| 900 |
K7 |
2.4 |
4.3 |
| 900 |
K8 |
3.3 |
5.2 |
| 900 |
K9 |
4.5 |
6.3 |
| 1000 |
K7 |
2.3 |
4.2 |
| 1000 |
K8 |
3.1 |
5 |
| 1000 |
K9 |
4.2 |
6 |
| 1200 |
K7 |
2.1 |
4.1 |
| 1200 |
K8 |
2.9 |
4.7 |
| 1200 |
K9 |
3.9 |
5.7 |
| 1400 |
K7 |
2 |
4 |
| 1400 |
K8 |
2.7 |
4.6 |
| 1400 |
K9 |
3.6 |
5.4 |
| 1500 |
K7 |
2 |
4 |
| 1500 |
K8 |
2.7 |
4.5 |
| 1500 |
K9 |
3.5 |
5.3 |
| 1600 |
K7 |
2 |
3.9 |
| 1600 |
K8 |
2.6 |
4.5 |
| 1600 |
K9 |
3.4 |
5.2 |
INT Maximum Recommended Depths Of Cover (m) (Main Roads, Soil Type C, Bedding in 100mm Loose Material)
Maximum Recommended Depths Of Cover (m)
(Main Roads, Soil Type C, Bedding in 100mm Loose Material) |
Nominal Size
(mm) |
Class |
Trench Type II |
Trench Type III |
| 100 |
K9 |
40 |
40 |
| 150 |
K9 |
18 |
19 |
| 200 |
K9 |
12 |
13 |
| 250 |
K9 |
9.7 |
10 |
| 300 |
K9 |
8.2 |
9.3 |
| 350 |
K9 |
7.2 |
8.4 |
| 400 |
K9 |
6.5 |
7.8 |
| 450 |
K8 |
4.6 |
6.2 |
| 450 |
K9 |
6 |
7.4 |
| 500 |
K8 |
4 |
6.1 |
| 500 |
K9 |
5.6 |
7.1 |
| 600 |
K7 |
2.3 |
4.6 |
| 600 |
K8 |
4 |
5.9 |
| 600 |
K9 |
5.1 |
6.8 |
| 700 |
K7 |
* |
4.3 |
| 700 |
K8 |
3.5 |
5.5 |
| 700 |
K9 |
4.8 |
6.5 |
| 800 |
K7 |
* |
4.1 |
| 800 |
K8 |
3.1 |
5.1 |
| 800 |
K9 |
4.6 |
6.4 |
| 900 |
K7 |
* |
4 |
| 900 |
K8 |
2.8 |
4.9 |
| 900 |
K9 |
4.2 |
6.1 |
| 1000 |
K7 |
* |
3.9 |
| 1000 |
K8 |
2.6 |
4.7 |
| 1000 |
K9 |
3.9 |
5.8 |
| 1200 |
K7 |
* |
3.7 |
| 1200 |
K8 |
2.3 |
4.5 |
| 1200 |
K9 |
3.5 |
5.4 |
| 1400 |
K7 |
* |
3.7 |
| 1400 |
K8 |
2.1 |
4.3 |
| 1400 |
K9 |
3.2 |
5.2 |
| 1500 |
K7 |
* |
3.7 |
| 1500 |
K8 |
2.1 |
4.3 |
| 1500 |
K9 |
3.1 |
5.1 |
| 1600 |
K7 |
* |
3.6 |
| 1600 |
K8 |
2 |
4.2 |
| 1600 |
K9 |
3.1 |
5 |
Notes:
*Type III Trench should be used for this condition.
|